RERAWA Railway Sleepers Request a quote
Metro set advancing on a viaduct, aerial

Composite railway sleeper

A service life
beyond fifty years

Trains run over Rerawa sleepers every day, on tracks already in revenue service.

A timber sleeper lasts fifteen years.

Timber sleepers are produced with creosote — a carcinogen whose use is restricted across the EU.

Recycling a timber sleeper is limited and difficult.

For timber sleepers, that cycle repeats roughly every fifteen years.

Material

Turning plastic waste into railway track, through Rerawa engineering

Plastic waste that would otherwise pollute becomes a sleeper built for more than fifty years of service. Close to timber in weight, Rerawa composite sleepers can be drilled and worked during installation, and coach-screw holes can be repaired with a compatible compound.

Service life
Beyond 50 years
Unit weight
110 kg
Service range
−15 °C … +50 °C
Testing
ISO 12856
Composite sleepers beneath the rail, coach-screw fastenings, close-up
Coach screws fasten directly into the sleeper; no steel baseplate is required.
A timber sleeper and a Rerawa composite sleeper side by side on the same track

The same dimensions, the same fastening —
a longer life than timber

A timber sleeper and a Rerawa composite sleeper on the same track. Cracking and fibre separation on the timber; surface integrity on the composite.

Range

Three sleeper
series

Separate sections for running line, turnout and bridge. Dimensions can be adapted to the project.

RW-100 series

Main-line sleeper

2600 × 260 × 160 mm.
A direct replacement for the timber sleeper.

Long composite turnout sleepers in a turnout zone RW-200 series

Turnout sleeper

For turnouts and diverging track where a longer sleeper is required.
Rerawa manufactures turnout sleepers up to six metres in its own plant.

RW-300 series

Bridge sleeper

2600 × 260 × 280 mm.
Produced for bridges and viaducts.

If the project falls outside Rerawa’s three series, dimensions and other product characteristics are developed to the specification.

Request a quote

Let’s plan the next
fifty years of your track

Tell us the track type, dimensions and delivery schedule.

Request a quote
Muallimköy, Gebze, Kocaeli, Türkiye